DatumEngineering Suite
Facility utilitiesIndustrial MEP Design

Industrial MEP Design

Compare building layouts and code limits, size the services, and issue the coordinated 3D model for Revit.

Active projectIndividual study
Design basis

Design basis

Set the building envelope and operating loads for this design case.

Building envelopeAXONOMETRIC
Scale this design case

Apply independent multipliers to the current inputs. The footprint factor preserves the building’s aspect ratio. Floor count and utility capacity limits stay fixed.